Approximately 5 minutes (controlled by PLC timer).
Yes. The PLC inside the load bank is connected to an industrial Ethernet switch (PoE type), supporting a standard 100 Mbps Ethernet connection.The upper-level PC/SCADA system can connect directly to the RJ45 port of this switch.
Protections include:
Interlock: Local/Remote mode selection (mutually exclusive)
The register list will be provided after production is completed.
Minimum step: 1 kW
About us
Quick Links
Application
Resource