loading
1800 kW AC Resistive Load Bank For Generator Testing or UPS 1
1800 kW AC Resistive Load Bank For Generator Testing or UPS 2
1800 kW AC Resistive Load Bank For Generator Testing or UPS 3
1800 kW AC Resistive Load Bank For Generator Testing or UPS 4
1800 kW AC Resistive Load Bank For Generator Testing or UPS 1
1800 kW AC Resistive Load Bank For Generator Testing or UPS 2
1800 kW AC Resistive Load Bank For Generator Testing or UPS 3
1800 kW AC Resistive Load Bank For Generator Testing or UPS 4

1800 kW AC Resistive Load Bank For Generator Testing or UPS

The Rata SIRL-1800kW AC resistive load bank is a professional load simulation testing solution integrating ultra-high power of 1800kW, precise 5kW step control, industrial-grade heat dissipation, intelligent management, and comprehensive protection functions. It is widely used for performance testing and verification of large-scale industrial power equipment, including large generators, UPS systems, data centers, and energy storage systems.
5.0
Warranty time:
2 years
Delivery time:
6 weeks
ISO Certification:
ISO9001/ISO14001
Brand:
RATA
Factory Price:
Negotiate
Supply Ability:
200,000 Piece/Pieces per Month
Port:
Shanghai and Guangzhou are both available
Payment Terms:
L/C,Cash,Western Union,T/T, Paypal
Min.Order Quantity:
1 pcs
ODM & OEM:
Available
Certification:
CE 60204 Standard​
design customization

    oops...!

    no product data.

    Go to homepage
    SILV-1800L Technical documentation
    SILV-1800L Technical documentation

    Product Introduction

    The Rata SIRL-1800kW AC resistive load bank is a professional load simulation testing solution integrating ultra-high power of 1800kW, precise 5kW step control, industrial-grade heat dissipation, intelligent management and comprehensive protection functions.


    It is widely used for performance testing and verification of large-scale industrial power equipment including large generators, UPS systems, data centers and energy storage systems.

    IMG_4156 拷贝

    Key Features and Advantages

    1800 kW AC Resistive Load Bank For Generator Testing or UPS 6
    Ultra-high power, covering all application scenarios
    调节
    Precise control with high test accuracy
    机箱风扇
    Efficient heat dissipation and high reliability
    1 (18)
    Flexible deployment with strong adaptability
    系统
    Intelligent management, easy for integration
    1800 kW AC Resistive Load Bank For Generator Testing or UPS 11
    Safe and reliable with comprehensive protection functions

    ENCLOSURE DRAWINGS

    未标题-1 (29)
    未标题-1 (29)

    Main Parameters

    Electrical Parameter
    Rated power 1800kW
    Power factor 1.0
    Rated load voltage. 400vac
    Hz. 50Hz.
    Phase & wires 3P4W
    Load resolution 5kW
    Voltage Tolerance (Short Term Operation) +5%
    Load Element Tolerance ± 3%
    Load connection Copper busbar
    Control power ATS Int/Ext Bascule
    Control voltage 400Vac
    Enclosure Structure
    Canopy/ container Container
    Noise level 85±3dB(A)
    Size(Width*Depth*Height mm) 2000*2950*2350
    Weight 2400kgs
    Air direction Horizontal
    Quantity of fans 4*  3kW
    Air volume(m³/kW/hour) 70
    Portability ISO lifting&locking points
    IP grade of control chamber 55
    IP grade of complete enclosure 54
    Load Bank Control
    Temperature -20 °C to +50°C
    Latitude ≦2000 m.a.s.l
    Load swithing 3 Pole contactor
    Digital meter V/A/kW/Hz/Pf.
    Interface RJ45
    Type of communication Modbus TCP
    Local control Bouton
    Remote control PC based software
    Power Derate At Other Voltages
    400Vac 1800kW
    380Vac 1625kW
    220Vac 545kW

    Key details

    IMG_4174_副本 拷贝
    IMG_4174_副本 拷贝
    IMG_4110_副本 拷贝
    IMG_4110_副本 拷贝
    IMG_4112_副本 拷贝
    IMG_4112_副本 拷贝
    IMG_4116_副本 拷贝
    IMG_4116_副本 拷贝
    IMG_4151_副本 拷贝
    IMG_4151_副本 拷贝

    FAQ

    1
    What are the key differences between the SIRL-1800kW and other 1800kW load banks?
    The SIRL-1800kW adopts precise 5kW step control (instead of 10kW or coarser steps) with an accuracy of ±3%. It supports the 8961 F2 generator testing function and features a more flexible side air outlet design. These features deliver superior performance in testing accuracy, functional capability and deployment flexibility.
    2
    Why is the load resolution set at 5kW instead of 1kW?
    The 5kW resolution achieves an optimal balance between reliability and precision. Compared with 1kW steps, the 5kW configuration requires fewer contactors, resulting in lower failure rates and reduced maintenance costs. Meanwhile, the ±3% accuracy fully meets the requirements of most industrial applications.
    3
    Will the 1800kW power rating be derated under 380V input voltage?
    Yes. The power will be derated to 1625kW at 380V, and 545kW under three-phase 220V. This is a normal consequence of reduced input voltage.
    4
    How does the fan system guarantee 24-hour continuous operation?
    Four 3kW three-phase industrial fans are installed with a total air volume of 70 m³/kW/h. Each fan is equipped with thermal relay and air pressure switch protection. This redundant design ensures remaining fans can maintain normal heat dissipation even if one fan malfunctions.
    5
    How to realize remote control and data acquisition?
    Remote control and data acquisition can be realized by connecting to a PC via RJ45 port and Modbus TCP communication protocol. The built-in 8961 F2 function supports real-time collection and analysis of generator test data.
    6
    What is the temperature resistance performance of the load elements?
    Nickel-chromium (Ni-Cr) resistance cores are adopted, with a temperature resistance up to 1200°C, guaranteeing reliable operation under high-load and high-temperature conditions.
    7
    Can the unit operate normally under extreme temperature environments?
    The operating temperature range is -20°C to +50°C. Temperature compensation and performance evaluation are recommended for extreme working environments.
    8
    What is the noise level, and is sound insulation treatment required?
    The noise level is 85±3 dB(A), which falls within industrial standards. Sound insulation treatment is recommended for indoor installation or sites near residential areas.
    9
    How to conduct routine maintenance and periodic inspections?
    Fan and contactor conditions should be inspected every 500 operating hours, and full maintenance shall be carried out every 1000 hours. Regularly clean heat sinks and inspect insulation conditions.
    10
    Does it support parallel connection of multiple units for power expansion?
    Multi-unit parallel operation is available via special design, but it requires professional electrical design and control systems. Please consult our technical support team for details.
    11
    How long does transportation and installation take?
    Fitted with ISO lifting lugs for direct crane mounting. Professional logistics teams are required for transportation, while installation and commissioning generally take 2 to 3 days.
    12
    Does it comply with international standards and certifications?
    It complies with EU standards including CE marking, RoHS compliance and the WEEE Directive, as well as domestic GB standards and IEC international standards.
    13
    How to quickly troubleshoot faults when abnormalities occur?
    Indicator lights on the control panel including Hi-Temp, Low air volume and E-STOP enable fast fault location.
    14
    Typical product delivery time?
    6 weeks.
    15
    Warranty service?
    2 years
    16
    Do you provide installation and testing support?
    Yes, Rata provides on-site testing services, including equipment installation, configuration, and data logging.
    17
    How many countries have you exported to?
    We export to over 80 countries worldwide.
    18
    Why choose us?
    We have ISO、CE certification and are Authorized factories for Siemens and Schneider Electric brands.
    Get in touch with us
    just leave your email or phone number in the contact form so we can send you a free quote for our wide range of designs
    Related Products
    Customer service
    detect