Yes. The energy meter communicates with the PLC, allowing SCADA systems to read power data.
Yes. The PLC inside the load bank is connected to an industrial Ethernet switch (PoE type), supporting a standard 100 Mbps Ethernet connection.The upper-level PC/SCADA system can connect directly to the RJ45 port of this switch.
Protections include:
Interlock: Local/Remote mode selection (mutually exclusive)
The register list will be provided after production is completed.
Approximately 5 minutes (controlled by PLC timer).
About us
Quick Links
Application
Resource