loading

Is our load bank equipped with a watchdog function?

2026-04-03

Yes. When the load bank is running:

  • If communication is lost,
  • The PLC will safely ramp down and stop the load after a timeout.
prev
Can power data be SCADA systems read via Modbus TCP?
How is the PLC IP address configured?
next
Related questions
no data
GET IN TOUCH WITH Us
Customer service
detect