loading

Is our load bank equipped with a watchdog function?

2026-04-03

Yes. When the load bank is running:

  • If communication is lost,
  • The PLC will safely ramp down and stop the load after a timeout.
prev
Can power data be SCADA systems read via Modbus TCP?
How is the PLC IP address configured?
next
Related questions
GET IN TOUCH WITH Us
Customer service
detect