10 100kW Resistive Unbalanced Loads Tested And Shipped

Recently, after coordination and cooperation among various departments and intensive work by the production department, 10 100kW resistive unbalanced loads have been completed. The technical engineer tested and inspected each load.

At the same time, at the request of foreign customers, the technical engineer first tested the load bank on a single machine, and tested the load bank with sudden addition and unloading through local manual control and computer control. The load bank responded immediately and all components operated normally. The customer also viewed its operation in real time through a remote conference.

Then, the technical engineer connected one and multiple units to conduct parallel testing. Through the software handheld device, the customer can remotely control it. The customer loads in real time on the handheld device. After entering the load value and clicking on the run, the load bank loads immediately, responds quickly, and the parallel status is good.

The customer participated in the delivery test and inspection throughout the process, which was recognized by the customer. The product was then shipped and delivered to the customer. It also increased the customer's trust in the product and the company, laying the foundation for further cooperation in the future.

 

100kW1

100kW1

prev
Understanding The Load Banks
Deyang Rata Technology Co., Ltd. To Attend MEE (Middle East Energy) 2025
next
recommended for you
no data
Get in touch with us
Customer service
detect