Product Overview
- AC resistive load bank (Rata R100kW) designed for indoor use; rated power 100 kW resistive only.
- Compatible with common three-phase voltages (380V / 400V / 415V) and can be customized; compact mobile cabinet (700 × 500 × 960 mm, 105 kg) on universal wheels.
- Local panel switching plus remote PC control via Rata-supplied English software (RJ45/PLC/generator tester interfaces).
Product Features
- Precise stepped loading: 1kW + 2kW + 2kW + 5kW + 10kW + 10kW + 20kW + 50kW for flexible load selection.
- 8020 Ni–Cr alloy finned resistors with forced-air cooling (horizontal intake/outlet) and copper-bar power connections with quick connectors.
- Protection functions: short circuit, overcurrent, high temperature, low air volume, fan fault and emergency stop.
- Control voltage 230 VAC, single-phase; data logging, curve/chart/table display, save and print capability.
- Packed for export (wooden case and pallet); generally shipped from Shanghai.
Product Value
- Provides reliable, repeatable resistive loading for commissioning, acceptance and maintenance tests, reducing risk and downtime.
- Accurate step control and data logging support performance verification and documentation for compliance and reporting.
- Mobile, compact and quickly deployable solution that lowers site labor and test preparation time.
- Customizable voltages and remote-control capability enable integration into diverse test workflows and automated test systems.
Product Advantages
- High-quality components and protections for safe, durable operation (Ni–Cr resistors, copper bus, forced-air cooling).
- Fine load granularity and remote PC/PLC control for precise, automated testing and result capture.
- Produced by an ISO9001-certified, patent-holding, nationally-recognized R&D company (Deyang Rata Technology) with extensive export experience and after-sales support.
- Quick production and attention to QA reduce risk of defects; compact, wheeled cabinet simplifies transport and positioning on site.
Application Scenarios
- Generator on-load testing and commissioning in power plants and shipyards.
- Transformer testing, UPS capacity testing and maintenance.
- Battery discharge/collector point tests and storage battery capacity verification.
- Data center commissioning, ship shore-power systems, new energy and grid-adaptability experiments, and other industrial load simulation needs.