Testing Wind Turbines With Load Bank

Most individual wind turbines require extensive mechanical and electrical commissioning. In order to meet all production deadlines and produce commercial power quickly, you as a wind farm operator must test every element of your operation.

In addition, testing alternative energy sources and using load banks for proper wind farm maintenance is also very important.

Leading Power Solutions understands the complexities of completing a commissioning solution, which includes reactive and resistive load banks, switchgear and generators for wind farms. This also means proper control of pre-grid commissioning.

In many cases, grids are not available. If your wind farm is often located in a remote area where no transmission lines are installed, using a load bank is the only option. And even when a grid is installed, interconnections often require pre-load testing and commissioning to ensure the efficiency of your system.

load box

Test your wind turbine generator and allow agreement before connecting; we offer you a wide range of reactive and resistive load banks at reasonable industry standard rates.

We even offer a range of cables to meet all your requirements. And, if you need access to height-restricted areas, the good news for you is that we also offer trailer mounted load box rentals, perfect for such elevated areas.

We have been in the industry for 7 years and each of our load banks is IP54 rated and designed to meet all specifications.

Find out how our well-designed resistive and reactive load banks can help:

They help to properly validate turbine installations and properly validate system performance required to purchase extended warranties for wind turbines.

Meet all commissioning deadlines and avoid utility company penalties by providing the appropriate amount of power in accordance with the terms of the agreement.

Our load banks also help ensure that all wind farms are fully tested to operating specifications. It also helps to verify/measure its power output and see if the unit is actually operating at optimum efficiency.

In addition to these key aspects, our load banks offer you these advantages for wind turbine testing:

Leading power solutions are even deploying on-demand wind turbines using microgrid solutions. Our load bank units will bring you zero failures and countless accurate wind turbine tests. Even more than 600 hours of continuous test time can be met for proper wind farm evaluation.

In addition, with our load bank solutions; you can achieve a realistic representation of sustainable, consistent and controllable loads, thereby minimising risk to wind power equipment.

prev
Briefly Describe The Method Of Controlling The Load Bank
Background And Purpose Of Load Testing Of Diesel Generator Sets in Data Centers
next
recommended for you
no data
Get in touch with us
Customer service
detect