loading
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 1
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 2
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 3
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 4
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 5
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 6
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 1
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 2
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 3
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 4
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 5
SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing 6

SILV-600L 600KW 415Vac Resistive Load Bank For Generator Testing

The RATA SILV-600L 600kW load bank is an industrial-grade load testing equipment featuring high power output, precise control, and strong environmental adaptability, suitable for verifying power systems of generators and data centers.
5.0
Warranty time:
3 years
Delivery time:
4 weeks
ISO Certification:
ISO9001/ISO14001
Brand:
RATA
Factory Price:
Negotiate
Supply Ability:
200,000 Piece/Pieces per Month
Port:
Shanghai and Guangzhou are both available
Payment Terms:
L/C,Cash,Western Union,T/T, Paypal
Min.Order Quantity:
1 pcs
ODM & OEM:
Available
Certification:
CE 60204 Standard​
design customization

    oops...!

    no product data.

    Go to homepage
    SILV-600L 600KW 415Vac Resistive Load Bank
    SILV-600L 600KW 415Vac Resistive Load Bank

    Product Introduction

    The RATA SILV-600L 600kW resistive load bank offers these core advantages:

    (1) 600kW medium-to-high power output;

    (2) 1kW fine load adjustment;

    (3) IP54 outdoor design;

    (4) highly reliable industrial-grade protection;

    (5) dual-voltage compatibility (415V/400V);

    (6) quick connection and mobile deployment.

    IMG_9540 拷贝 (4)

    ENCLOSURE DRAWINGS

    This info given is our standard load bank features. we are constantly looking to imporove our design. We reserve the right to change with prior notice. The finished design maight slightly vary from this given TDS.

    1 (109)
    side view
    2 (86)
    IP 54 enclosure . 2mm thickness steel
    3 (59)
    front view
    4 (43)
    top view

    Main Parameters

    Model No. SILV600-L
    Country of origin China
    Max capacity 600kW
    Rated testing voltage 415Vac
    Frequency 50/60Hz.
    Phases 3
    Wires(Star connection) 4
    Load step resolution 1kW
    Load step (kW) 1 +2+2+5 +10+10+20+50+ 100+100+100+200
    Voltage Tolerance (Short Term Operation) +6%
    Load Element Tolerance ±3%
    Insulation Test 600Vac
    Load Connections 400A waterproof quick connector
    Protection Thermal emergency cut out
    Air flow switch
    Fan overload protection
    Emergency stop
    Control voltage 415Vac / 3 phases 5wires
    Cooling method Air forced cooling
    Airflow volume(Approx. CMM) Each kW 70m³/h
    Airflow direction Horizontal
    Load switching contactor type 3 pole AC contactors
    Rated maximum ambient temp. operation +50°C / +122°F
    Rated minimum ambient temp. operation -20°C / -4°F
    Altitude rating <2000m [m.a.s.l]
    Control chamber IP rating IP 84 (Outdoor using)
    Portability Castor*4
    Enclosure dimentions
    Length(mm) 1410
    Depth(mm) 1100
    Height(mm) 1020
    Weight(KG) 800
    Load bank control system
    Manual control HMI touch screen+ digital meter
    Remote control PC Software
    Test voltage(3 phases) Power derating with lower voltage applied.
    415V 600 kW
    400V 557 kW

    Key details

    IMG_9556 拷贝
    IMG_9556 拷贝
    IMG_8588 拷贝
    IMG_8588 拷贝
    IMG_9536 拷贝
    IMG_9536 拷贝
    IMG_9538 拷贝
    IMG_9538 拷贝
    IMG_9539 拷贝
    IMG_9539 拷贝
    IMG_9544 拷贝
    IMG_9544 拷贝

    FAQ

    1
    What are the main generator testing scenarios for this 600kW load bank?
    This equipment is mainly used for: generator factory acceptance test (FAT), on-site commissioning (SAT), standby generator acceptance test, and regular maintenance & loaded test. It can simulate real loads to verify the output capability of generators under different working conditions.
    2
    Can this load bank be used for full-load testing of generators?
    Yes. The rated power of the equipment is 600kW (415V), which supports stepped loading at 25% / 50% / 75% / 100% and stable full-load operation test for generators.
    At 400V, the equipment can operate with proportional derating (approximately 557kW) and still complete most testing tasks.
    3
    How to realize stepped loading of generators with this load bank?
    The equipment supports 1kW step adjustment and adopts multi-stage load combination:
    1kW → 2kW → 5kW → 10kW → 20kW → 50kW → 100kW → 200kW
    Through combined control, smooth loading, fine adjustment, and simulation of actual power consumption growth can be achieved.
    4
    What is the accuracy of this equipment in generator testing?
    Overall accuracy: ±3%; resistance tolerance: ±3%; voltage tolerance: ±5% (short-term). It meets the requirements of generator performance test and acceptance standards.
    5
    How does this load bank ensure the safety of generator testing?
    The equipment is equipped with multiple protection mechanisms: over-temperature protection (thermal cut-out); airflow detection protection (airflow switch); fan overload protection; emergency stop system.
    In case of abnormality, the equipment will automatically cut off the load to avoid damage to the generator.
    6
    What types of generators is this load bank suitable for?
    Suitable for: diesel generator sets; gas generator sets; industrial standby power supply systems.
    Especially applicable to: 400V / 415V three-phase system generators.
    7
    Can the cooling system support long-duration testing?
    Yes. The equipment adopts a forced air cooling system with high air volume design (approximately 700 m³/h per fan). It supports long-term full-load operation and continuous load testing of generators.
    8
    Is the equipment suitable for outdoor generator testing?
    Yes. The equipment features: IP54 protection rating (for outdoor use); operating temperature: -20°C ~ +50°C. It can be used in construction sites, power stations, and outdoor generator testing scenarios.
    9
    Typical product delivery time?
    4 weeks.
    10
    Warranty service?
    3 years.
    11
    Do you provide installation and testing support?
    Yes, Rata provides on-site testing services, including equipment installation, configuration, and data logging.
    12
    How many countries have you exported to?
    We export to over 80 countries worldwide.
    13
    Why choose us?
    We have ISO、CE certification and are Authorized factories for Siemens and Schneider Electric brands.
    Get in touch with us
    just leave your email or phone number in the contact form so we can send you a free quote for our wide range of designs
    Related Products
    no data
    Customer service
    detect