Load bank application for data sheet include capacity testing,performance verification,daily maintenance and testing,new equipment debugging,system upgrade evaluation,redundancy testing,energy saving optimization and simulate fault scenarios
Rata is designed by a professional team of designers who are strictly hired by our company.
1. Power capacity testing: Verify the power supply capacity of the data center at different load levels, including full load and partial load conditions.
2. Voltage stability test: Monitor whether the fluctuation of the output voltage during the loading process is within the allowable range.
3. Frequency stability test: Ensure that the frequency remains stable without significant fluctuations.
4. UPS performance testing: testing in areas such as switching time and output quality.
5. Diesel generator load test: Test the reliability and stability of its load operation after starting.
6. Power switching test: Verify the continuity and impact on the system when switching between different power sources.
7. Continuous running test: Apply load for a long time, observe the performance and reliability of the system during long-term operation.
8. Temperature rise test: Detect the temperature changes of key equipment under load to prevent overheating.
9. Harmonic testing: Check the harmonic situation generated by the load on the power grid to avoid harmonic interference.
10. Efficiency testing: Evaluate the energy utilization efficiency of the data center power supply system under different loads.
11. Redundant backup test: Verify whether the redundant system can effectively take over the load in the event of a main system failure.
12. Dynamic response testing: Examining the system's response speed and recovery ability to rapid changes in load.
1. Capacity testing: used to verify whether the power supply system of the data center can meet the designed load capacity requirements, ensuring that it has sufficient power supply capacity.
2. Performance verification: It can verify the performance of key equipment such as uninterruptible power supply (UPS) and diesel generator sets under different load conditions, including voltage stability, frequency stability, etc.
3. Daily maintenance and testing: Regular load testing is conducted to ensure that the equipment is in good working condition and potential problems are detected in a timely manner.
4. New equipment debugging: After the installation of the new power equipment, use a load bank for debugging and verification.
5. System upgrade evaluation: When the power supply system is upgraded and renovated in the data center, the load bank can be used to evaluate the effect of the upgrade.
6. Redundancy testing: Verify the reliability and switching performance of redundant power supply configurations.
7. Energy saving optimization: By analyzing the load situation, help optimize the power distribution and load management of data centers, and achieve energy-saving goals.
8. Simulate fault scenarios: It can simulate special load situations such as equipment failures to evaluate the system's response capability and develop emergency plans.
Rack Mounted Load Bank
Rata supply 3kW,3.5kW,4kW,5kW,6kW,7kW,10kW,12kW and customized power capacity rack mounted load bank for data center load test.
Resistive Load Bank
Rata supply 10kW~70000kW resistive load bank for generator load test.
branded product is known for their longer service life.