Product Overview
- A purpose-built 5 MW, 20 kV containerized AC load bank from Rata, designed specifically to support wind power grid-balancing operations.
- Delivered in a durable ISO-standard shipping container for transportability and outdoor deployment, with systematic quality control, rigorous testing, and relevant certifications.
Product Features
- Wind-power focused design: simulates real electrical loads and absorbs excess turbine output to stabilize the grid.
- High-capacity, high-voltage: 5 MW nominal at 20 kV with direct high-voltage compatibility (no intermediate transformer required).
- Containerized construction: rugged, compact, and easily deployable at remote or temporary sites.
- Advanced cooling: high-efficiency axial fan system plus a 1.5 m wind chimney to manage heat during high-load operation.
- Dynamic load control: precise, responsive load adjustment with stepped and continuous control modes for a wide range of scenarios.
- Safety & monitoring: over-temperature protection, fault detection, emergency stop, grounding, and compliance with international electrical/safety standards.
- Control options: local operator interface (voltage, current, power, temperature readouts) and remote SCADA integration for centralized monitoring and control.
Product Value
- Ensures grid stability by safely dissipating excess wind generation and smoothing power fluctuations from variable renewable sources.
- Enables accurate simulation of load profiles for testing, commissioning, and performance validation of turbines and grid equipment.
- Reduces installation complexity and cost by supporting direct high-voltage connection (eliminates intermediate transformers).
- Portable and robust for rapid deployment at remote wind farms or temporary test sites, improving operational flexibility.
- Backed by certified testing and company quality control for dependable, predictable performance.
Product Advantages
- User-confirmed design developed by in-house engineers and designers, balancing functionality and practical field needs.
- Thoroughly tested and certified to ensure reliable operation in demanding outdoor and high-voltage environments.
- Full-service support from Deyang Rata Technology Co., Ltd.: design, rapid response, and post-sale service to simplify emergencies and deployments.
- Integrated safety systems and international-standard compliance reduce operational risk and simplify regulatory acceptance.
- Flexible control and monitoring make it easy to integrate into existing wind-farm SCADA and grid-management systems.
Application Scenarios
- Grid stability management at wind farms (dissipating excess power during low demand periods).
- Commissioning, testing and routine turbine acceptance tests (load profile simulation and performance verification).
- Renewable integration studies and power-quality assessments for grid operators and utilities.
- Temporary or remote site operations where portable, high-voltage load capability is needed.
- Laboratory or field testing for electrical equipment, protection schemes, and control-system validation.
|
Description |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|