On the morning of September 6, after coordinating the transportation, the staff packed the 5MW high-voltage pure resistive load bank on site. The staff tightly wrapped it with two layers of rainproof cloth to ensure that unnecessary damage was reduced during transportation. Because the cabinet is huge, it caused considerable pressure and difficulty to move it. With the help of auxiliary tools such as forklifts and cranes, it was finally placed on the transport truck and has now been sent to the customer.