loading

Haboat Electric UPS Complete System Load Bank Rental Test

Load banks are commonly used in data center UPS, power supply testing and daily maintenance . By using load banks for testing, it can be ensured that the UPS system can provide stable and reliable power supply in the face of various actual operating conditions and potential failures. In order to test its stability, Deyang Rata Technology Co., Ltd. led technical backbones to load test the Haboat Electric UPS system on July 16, 2024 .

In this test, Rata used 7 sets of R500kW/AC400V-690V resistive load banks to test the performance parameters, protection devices, load balancing, etc. of the UPS system to evaluate its performance parameters under different load conditions and environmental conditions. At the same time, it can help quickly locate the fault type and fault location, as well as the accuracy and response speed of action under guaranteed conditions, thereby improving the safety and reliability of system operation.

UPS11

 (Testing site)

verlieben
150kvar Inductive Load Bank Test Completed
100kW Resistive Load Bank Factory Test For Honduras Customer
Nächster
für Sie empfohlen
keine Daten
Kontaktieren Sie uns
Kontakte: Gong Zhenhua
Telefon/ WhatsApp : 0086-13890270038
Adresse: Hongyu Road East, Jinshan Industrial Park, Bezirk Luojiang, Deyang. China
Customer service
detect